Case studies

Transport for London – London Network

Works on the Transport for London Network. Ongoing Works which includes the provision of Skilled Track Teams for both the London Underground Operations and Projects directorate plus DLR, together with undertaking Lump Sum packages. Our current regular workforce are focused on the TFL and DLR network and their numbers are in excess of 250 working […]

Read More

Simens Mobility Division Edinburgh Tram – Street Running Works

Works Commenced November 2011 and completed May 2013. The Scope of Work Included: Responsible for the remedial works to already installed twin track section on Princes Street (approx. overall track length 2km) and then install the remainder of the street running track. Provision of track installation workforce, plant and equipment, the management of and logistics […]

Read More

Kier / P-Way renewals and Civil Engineering Support in association with bridge Renewals

Project Start Date March 2013 – Completion July 2013. The Scope of Work Included: Responsible for the track removal to facilitate the removal and renewal of 11 existing bridges, together with the P-way reinstatement (renewal) , including materials provision, engineering, track installation, stressing, Track Handback, and track monitoring, together with Signalling support for the works. […]

Read More

London Underground

Remodeling & re-development of two depots to provide facilities for maintaining the new “S7” Fleet of trains. – London Underground – Upminster and Ealing Common Depots. Project start date: May 2012 – Completion date Feb 2015. The Scope of Work Included: Removal of tracks and S&C Units – approx. length of 8250 m Provision and […]

Read More

Associated British Ports

Associated British Ports – Southampton, Eastern Dock Rail Improvement Works Renewal and Remodelling of Eastern Docks Infrastructure during 19 day blockade. Works Commenced July 2014 – Completed August 2014. The Scope of Work Included: Removal of existing ballasted track – 1200m Break out and Remove track in concrete – 200m Excavation and disposal of materials […]

Read More

P-Way renewal – Network Rail infrastructure

Selby Swing Bridge P-Way Renewals -Bridge and Approach Tracks: Project Start Date: 26th July 2014 – Completion Date: 7th September 2014 (6 week Blockade). The Scope of Work Included: 1stinrail were responsible for the track removal to facilitate the upgrade of the bridge deck and rail bearers as part of a major upgrade of the […]

Read More

Graham Construction – Associated British Ports

Graham Construction – Associated British Ports – Immingham: Renewal and Remodeling of the existing Turnback Facility. The Scope of Work Included: Take up of ballasted track – 1500m Installation of ballasted Track – 2600m Installation of ballasted Turnouts – 4 nr Installation of expansion Switches 8 nr Stressing of Tracks Installation of slab track and […]

Read More

Constrction Marine Limited – Harwich Dock Hoob Upgrade Works

Works Commenced November 2014 completed April 2015. The Scope of Work Included: Take up of existing plain line timber sleeper track – 955m. Installation of ballasted track on concrete sleepers – 490m. Installation of plain line ballasted track on new short ended hardwood sleepers (Pan 11 Baseplates) – 375m. Installation of track in embedded concrete […]

Read More

MPB Structures – West Coast Mainline-Orphanage Road, Watford

The Scope of Work Included: Removal and reinstatement of p-way across a 5 deck bridge during an Easter Possession on the WCML. These works formed part of the Watford Alliance Rail Projects high priority works and allowed our client to carry out a full deck reconstruction on the bridge. The scheme was handed back 10hrs […]

Read More

Buckingham Group – EBBW Vale, Wales

Buckingham Group – EBBW Vale, Wales. Work Commenced February 2015- Completed May 2015. The Scope of Work Included: Remodel existing station interface, Installation of new track and slew of existing track through station – 70m Installation and commissioning of new plain line track– 2200m Installation of permanent access facility        

Read More


1stinrail Limited © 2015.
Head Office, 1D North Crescent, Cody Road, London E16 4TG. Tel: 0207 474 1459