Construction Marine Limited – Melton Mowbray

Installation of New Siding.

Project Commenced January 2015- completed March 2015.
The Scope of Work Included:
  • P-way and OHLE Design,
  • Remove existing plain line track,
  • Installation of new BV8 flat bottomed turn out,
    complete with new hardwood timbers.
  • Installation of plain line track in ballast – 99m
  • Installation of embedded track in concrete within a shed – 18m
  • Installation of direct fixed track onto steel bridge beams – 12m
  • OHLE Slew and adjustments to achieve design tolerances