Graham Construction – Associated British Ports
Graham Construction – Associated British Ports – Immingham:
Renewal and Remodeling of the existing Turnback Facility.
The Scope of Work Included:
- Take up of ballasted track – 1500m
- Installation of ballasted Track – 2600m
- Installation of ballasted Turnouts – 4 nr
- Installation of expansion Switches 8 nr
- Stressing of Tracks
- Installation of slab track and Rail Weigh facility
- Possession for Connection into NWR Infrastructure