Graham Construction – Associated British Ports

Graham Construction – Associated British Ports – Immingham:

Renewal and Remodeling of the existing Turnback Facility.

The Scope of Work Included:
  • Take up of ballasted track – 1500m
  • Installation of ballasted Track – 2600m
  • Installation of ballasted Turnouts – 4 nr
  • Installation of expansion Switches 8 nr
  • Stressing of Tracks
  • Installation of slab track and Rail Weigh facility
  • Possession for Connection into NWR Infrastructure