Kier / P-Way renewals and Civil Engineering Support in association with bridge Renewals

Project Start Date

March 2013 – Completion July 2013.

The Scope of Work Included:
  • Responsible for the track removal to facilitate the removal and renewal of 11 existing bridges,
    together with the P-way reinstatement (renewal) , including materials provision, engineering,
    track installation, stressing, Track Handback, and track monitoring, together with Signalling
    support for the works.
  • The main works – including 9 bridges, were undertaken during 2 blockades
  • In total we removed, re-laid and re-tamped approx. 1500 lin. meters of track in the blockades.