Kier / P-Way renewals and Civil Engineering Support in association with bridge Renewals
Project Start Date
March 2013 – Completion July 2013.
The Scope of Work Included:
- Responsible for the track removal to facilitate the removal and renewal of 11 existing bridges,
together with the P-way reinstatement (renewal) , including materials provision, engineering,
track installation, stressing, Track Handback, and track monitoring, together with Signalling
support for the works. - The main works – including 9 bridges, were undertaken during 2 blockades
- In total we removed, re-laid and re-tamped approx. 1500 lin. meters of track in the blockades.