Craigentinny and Reading IEP depots
Posted in:
Depots and sidings
Posted in:
Depots and sidings
Upgrading and remodelling works carried out at Craigentinny and Reading Intercity Express Programme (IEP) depots on behalf of C Spencer.
Responsibilities included
- Take up of ballasted track, S&C and buffer stops
- Installation of new ballasted track including S&C utilising Kirow 1200T rail mounted crane
- Installation of new stub column track as part of a new wheel lathe facility
- Installation of slab track as part of new CET and train wash facility
- Installation of troughing route and cable management system
- Installation of walkways
- Installation of RRAP
- Tamping of new track