Rail improvements on the Eastern Dock rail, Southampton

Posted in: Network Rail and Metro Systems
Posted in: Network Rail and Metro Systems

The renewal and remodelling of Southampton’s Eastern Docks infrastructure during a 19-day blockade.

Responsibilities included

  • Take up of ballasted track (1200m)
  • Break out and remove track in concrete (200m)
  • Excavation and disposal of materials
  • Preparation of formation
  • Installation of track drainage
  • Installation of ballasted track (1350m)
  • Installation of ballasted turnouts (2 no.)
  • Installation of embedded track, including concrete pour (150m)
  • Installation of proprietary crossing (2 no.)